Blog

Inflatable Cabinet Operation Sequence

Publish Time: Author: Site Editor Visit: 9

The operation sequence of Gas filled cabinet usually includes the following steps to ensure safe and correct operation:

Check the air pressure: Before operation, first check the air pressure gauge of the inflatable cabinet to ensure that the air pressure is within the safe range. If the air pressure is abnormal, stop the operation immediately and contact the manufacturer.

Operate the grounding switch: Use the special handle and turn it counterclockwise to disconnect the grounding switch. Make sure that the grounding switch is in the disconnected state before operating the isolating switch.

Operate the isolating switch: When both the grounding switch and the circuit breaker are in the disconnected state, insert the handle into the isolating switch control hole and turn it clockwise to close the isolating switch.

Operate the circuit breaker: If it is a manual switch, insert the handle into the circuit breaker control hole and turn it clockwise to close the switch. If it is an electric control switch, charge the mechanism first, and then press the closing button lightly.

Check the operation results: After the operation is completed, check the status of each switch and the air pressure again to ensure that everything is normal.

Close and clean up: After the operation is completed, close all valves, clean up the equipment, and ensure that the equipment is in a safe state.

Please note that you should follow the specific instructions in the equipment manual during operation and ensure that all operating steps comply with safety regulations‌.

Inflatable Cabinet Operation Sequence

Next The Difference Between An Inflatable Cabinet And An Air Cabinet