What Are The Basic Requirements For Recording Electrical Energy Readings For Line Fittings?
Connector Insert What are the basic requirements for recording the electric energy indication?
When reading the meter on site, the meter reader must see the meter and record the indication. The meter reader should record the indication on the meter counter. Generally, customers should record all integer digits; if the customer is equipped with a metering transformer, the decimal digits of the indication should also be recorded. For customers with separate meters, in addition to recording the total indication of the customer, all the customer's separate meters must also be recorded simultaneously. For multi-function meters, it is also necessary to check whether there is reverse electricity. If there is reverse electricity, the reverse electricity should also be recorded and recorded. When recording the indication of the maximum demand of the month, the frozen number of the demand of the previous month must also be recorded. The customer indications collected by collective reading and negative control should be checked and verified.